{"id":7218,"date":"2024-08-26T12:55:04","date_gmt":"2024-08-26T12:55:04","guid":{"rendered":"https:\/\/axatc.ro\/?p=7218"},"modified":"2024-08-26T13:02:09","modified_gmt":"2024-08-26T13:02:09","slug":"on-going-project-electric-bus-depot-in-chitila-city","status":"publish","type":"post","link":"https:\/\/axatc.ro\/en\/on-going-project-electric-bus-depot-in-chitila-city\/","title":{"rendered":"On going project: electric bus depot in Chitila City"},"content":{"rendered":"<div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_center\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"2308\" height=\"1126\" src=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2.jpg\" class=\"vc_single_image-img attachment-full\" alt=\"\" title=\"vedere panoramica 2\" srcset=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2.jpg 2308w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2-300x146.jpg 300w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2-1024x500.jpg 1024w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2-768x375.jpg 768w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2-1536x749.jpg 1536w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-2-2048x999.jpg 2048w\" sizes=\"auto, (max-width: 2308px) 100vw, 2308px\" \/><\/div>\n\t\t<\/figure>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>In the context of Chitila\u2019s adoption of a low-carbon public transportation system, we are proud to announce the start of construction on a new bus terminal and depot, dedicated to the recently acquired electric bus fleet by the municipality.<\/p>\n<p>This project addresses the need to modernize public transportation infrastructure and offers a range of essential facilities for the efficient and sustainable operation of electric buses:<\/p>\n<ul>\n<li><strong>Battery charging<\/strong>: The depot will be equipped with fast and slow charging stations for electric buses, ensuring full battery charging.<\/li>\n<li><strong>Security<\/strong>: Buses will be protected overnight, benefiting from a video surveillance system and controlled access.<\/li>\n<li><strong>Maintenance and service<\/strong>: A dedicated area for technical inspections, maintenance, and repairs will be created, optimized for quick and efficient service.<\/li>\n<li><strong>Bus washing facility<\/strong>: The project includes a building dedicated to bus washing, equipped with modern wastewater collection and treatment systems.<\/li>\n<li><strong>Operations and dispatch<\/strong>: Administrative offices and dispatch rooms will be integrated to efficiently manage routes and schedules.<\/li>\n<\/ul>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_left\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"2000\" height=\"1333\" src=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-1.jpg\" class=\"vc_single_image-img attachment-full\" alt=\"\" title=\"Depou Chitila 1\" srcset=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-1.jpg 2000w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-1-300x200.jpg 300w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-1-1024x682.jpg 1024w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-1-768x512.jpg 768w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-1-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><\/div>\n\t\t<\/figure>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>The depot will be located in Chitila, Ilfov County, on a 14,643 sqm plot that had significant slopes and required substantial earthworks to be prepared for construction.<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_left\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"2000\" height=\"1333\" src=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-3.jpg\" class=\"vc_single_image-img attachment-full\" alt=\"\" title=\"Depou Chitila 3\" srcset=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-3.jpg 2000w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-3-300x200.jpg 300w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-3-1024x682.jpg 1024w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-3-768x512.jpg 768w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-3-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><\/div>\n\t\t<\/figure>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>The proposed project includes the arrangement of the terminal premises with the following features:<\/p>\n<ul>\n<li><strong>Roadways and secondary paths<\/strong> for bus and staff vehicle access.<\/li>\n<li><strong>Utility zones<\/strong> for fire-fighting systems, recycling tanks, and other technical equipment.<\/li>\n<li><strong>Maintenance building<\/strong>: A constructed area of 571.5 sqm, providing space for parking and charging 4 buses.<\/li>\n<li><strong>Administrative and dispatch building<\/strong>: An area of 531.58 sqm, including offices, reception, meeting rooms, locker rooms, and workshops.<\/li>\n<li><strong>Washing facility<\/strong>: An area of 273.20 sqm, with two washing bays for buses and corresponding equipment.<\/li>\n<li><strong>Outdoor charging area<\/strong>: 34 bays covered with metal canopies and 4 additional bays in the northern part of the plot.<\/li>\n<li><strong>Video surveillance system<\/strong> and controlled access through a gate control cabin.<\/li>\n<\/ul>\n<p>The project covers a total area of 14,643 sqm, with 20% of the land dedicated to green space, and will include 18 parking spaces for cars and 39 spaces for buses.<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_left\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"2000\" height=\"1333\" src=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-4.jpg\" class=\"vc_single_image-img attachment-full\" alt=\"\" title=\"Depou Chitila 4\" srcset=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-4.jpg 2000w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-4-300x200.jpg 300w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-4-1024x682.jpg 1024w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-4-768x512.jpg 768w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-4-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><\/div>\n\t\t<\/figure>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\" ><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_left\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"2488\" height=\"1134\" src=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3.jpg\" class=\"vc_single_image-img attachment-full\" alt=\"\" title=\"vedere panoramica 3\" srcset=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3.jpg 2488w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3-300x137.jpg 300w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3-1024x467.jpg 1024w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3-768x350.jpg 768w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3-1536x700.jpg 1536w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3-2048x933.jpg 2048w, https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/vedere-panoramica-3-1100x500.jpg 1100w\" sizes=\"auto, (max-width: 2488px) 100vw, 2488px\" \/><\/div>\n\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>By realizing this project, Axatc contributes to the improvement of public transportation infrastructure in Chitila, while also promoting a greener and more sustainable urban environment.<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"In the context of Chitila's adoption of a low-carbon public transportation system, we are proud to announce the start of construction on a new bus terminal and depot, dedicated to the recently acquired electric bus fleet by the municipality. This project addresses the need to modernize public transportation infrastructure and offers a range of essential [...]","protected":false},"author":1,"featured_media":7222,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-7218","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","wd-post",false],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>On going project: electric bus depot in Chitila City - Axa Trans Construct<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/axatc.ro\/en\/on-going-project-electric-bus-depot-in-chitila-city\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"On going project: electric bus depot in Chitila City - Axa Trans Construct\" \/>\n<meta property=\"og:url\" content=\"https:\/\/axatc.ro\/en\/on-going-project-electric-bus-depot-in-chitila-city\/\" \/>\n<meta property=\"og:site_name\" content=\"Axa Trans Construct\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/axatc2004\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-26T12:55:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-26T13:02:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/axatc.ro\/#website\",\"url\":\"https:\/\/axatc.ro\/\",\"name\":\"Axa Trans Construct\",\"description\":\"We are a Construction Company\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/axatc.ro\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-2.jpg\",\"contentUrl\":\"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-2.jpg\",\"width\":2000,\"height\":1333},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#webpage\",\"url\":\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/\",\"name\":\"On going project: electric bus depot in Chitila City - Axa Trans Construct\",\"isPartOf\":{\"@id\":\"https:\/\/axatc.ro\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#primaryimage\"},\"datePublished\":\"2024-08-26T12:55:04+00:00\",\"dateModified\":\"2024-08-26T13:02:09+00:00\",\"author\":{\"@id\":\"https:\/\/axatc.ro\/#\/schema\/person\/7dd9af58f13f24a7599b2b261181cb0e\"},\"breadcrumb\":{\"@id\":\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/axatc.ro\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"On going project: electric bus depot in Chitila City\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/axatc.ro\/#\/schema\/person\/7dd9af58f13f24a7599b2b261181cb0e\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/axatc.ro\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ddfeb736a5b76c344e037a4040ee8b57b893b667fd6027d2a8eb863e021fd512?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ddfeb736a5b76c344e037a4040ee8b57b893b667fd6027d2a8eb863e021fd512?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/axatc.ro\"],\"url\":\"https:\/\/axatc.ro\/en\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"On going project: electric bus depot in Chitila City - Axa Trans Construct","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/axatc.ro\/en\/on-going-project-electric-bus-depot-in-chitila-city\/","og_locale":"en_US","og_type":"article","og_title":"On going project: electric bus depot in Chitila City - Axa Trans Construct","og_url":"https:\/\/axatc.ro\/en\/on-going-project-electric-bus-depot-in-chitila-city\/","og_site_name":"Axa Trans Construct","article_publisher":"https:\/\/www.facebook.com\/axatc2004\/","article_published_time":"2024-08-26T12:55:04+00:00","article_modified_time":"2024-08-26T13:02:09+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-2.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/axatc.ro\/#website","url":"https:\/\/axatc.ro\/","name":"Axa Trans Construct","description":"We are a construction company.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/axatc.ro\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#primaryimage","inLanguage":"en-US","url":"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-2.jpg","contentUrl":"https:\/\/axatc.ro\/wp-content\/uploads\/2024\/08\/Depou-Chitila-2.jpg","width":2000,"height":1333},{"@type":"WebPage","@id":"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#webpage","url":"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/","name":"On going project: electric bus depot in Chitila City - Axa Trans Construct","isPartOf":{"@id":"https:\/\/axatc.ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#primaryimage"},"datePublished":"2024-08-26T12:55:04+00:00","dateModified":"2024-08-26T13:02:09+00:00","author":{"@id":"https:\/\/axatc.ro\/#\/schema\/person\/7dd9af58f13f24a7599b2b261181cb0e"},"breadcrumb":{"@id":"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/axatc.ro\/on-going-project-electric-bus-depot-in-chitila-city\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/axatc.ro\/"},{"@type":"ListItem","position":2,"name":"On going project: electric bus depot in Chitila City"}]},{"@type":"Person","@id":"https:\/\/axatc.ro\/#\/schema\/person\/7dd9af58f13f24a7599b2b261181cb0e","name":"admin","image":{"@type":"ImageObject","@id":"https:\/\/axatc.ro\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/ddfeb736a5b76c344e037a4040ee8b57b893b667fd6027d2a8eb863e021fd512?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ddfeb736a5b76c344e037a4040ee8b57b893b667fd6027d2a8eb863e021fd512?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/axatc.ro"],"url":"https:\/\/axatc.ro\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/posts\/7218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/comments?post=7218"}],"version-history":[{"count":3,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/posts\/7218\/revisions"}],"predecessor-version":[{"id":7228,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/posts\/7218\/revisions\/7228"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/media\/7222"}],"wp:attachment":[{"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/media?parent=7218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/categories?post=7218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/axatc.ro\/en\/wp-json\/wp\/v2\/tags?post=7218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}