The progress of the project La Strada Street Mall – Bragadiru

September 16, 2019

After we’ve been working for a month, the structure of the construction’s resistance was completed. It consists of reinforced concrete columns and metal beams. Now we are working simultaneously on the perimeter closures of the building and the works of external installations. We believe that the casting of the floor tiles will begin in about two weeks.