Projects

Magazinul Bucuresti

The new project is a building with historical value of the old center of Bucharest, with a 90-year history now ready to host the first visitors after 30 years. The building keeps curved glass windows, specific to the interwar store and is designed for retail spaces, offices and restaurants. The project had a total area of ​​approximately 3,600 square meters, divided into seven levels.

La Strada Street Mall Bragadiru

The total built area was 3700 square meters. The project consisted of erecting 3 buildings totaling 2000 square meters for commercial spaces. The difference of 1700 sqm was represented by access roads, parking and green spaces.

The Archive Chamber of Notaries Bucharest

With an area of ​​3300 sqm it houses several archive compartments, but also a generous office space for its staff.

Globalworth Tower Parking

The project consisted of expanding an existing parking lot, built above a store. The works carried out include: the construction of a new concrete structure, a new waterproofing, plating with aluminum blades, signaling and electromechanical installations. Built area 2200 sqm

Sanador – Piata Victoriei

Sanador Oncology Clinic building 2S + GF + 6E with historical monument building integration – Mixed old and new, the work was started in May 2017 and completed in July 2018, in record time, being a small challenge for our company. The space was quite small and the construction of the two basements was made under the historic monument house which was suspended by a special metallic structure.

Mega Image and Decathlon – Baneasa

Magazinul Bucuresti – Old Town Bucharest

Blend Leisure Suites – Gh. Pop de Basesti str, Bucharest

Residential complex – Privilage Apartments

Residential complex – Privilage Apartments

Reinforcement of a historic house – Clucerului str.

La Strada – Militari

La Strada – Brasov

La Strada – Popesti Leordeni